Exec Summary

" The Woody Project” is always to expand the availability floor from the Custom Woodworking Company by 25% with a budget of $17 million within an 18 month time-frame wherein a semi-automatic creation train will be designed and implemented along with other amities to improve production on the quality anticipated by the stakeholders and their cliental. Background

The Custom Woodworking Company set up in 1954 produces personalized furniture and cabinets to order away of Industrial Properties, Someplace, BC. The Custom Woodworking Industry�s plan is perfect for the expansion of is production flooring by 25% with a maximum budget of $17 mil. Objective

The main object of this project is always to expand the availability capacity to the equivalent of 25% of the exiting floor area. On this occasion would include additional compressor capacity, development train, fresh software/ hardware to run semi-automatic train, dust-free paint, a/c units, and the finishing from the shop. Detailed Statement

To meet the objective over a team need to design, build, install, and test/ start-up new gear along with the building and unit installation and a production flooring and services required simply by stakeholders. Period and Expense

The duration of this task to meet most objectives through the phases defined in SOW is to not really exceed 1 . 5 years starting from project start to tools running on production ground at a cost of no longer that $17 million not including the remodelling of offices. Appendices

Solutions will be ripped from within the business for lead positions as their knowledge is sought after. The designing with the semi-automatic coach with become contracted to be able to an anatomist firm intended for installation and new gear.

Construction with be sub-contracted out to regional contractors to get installation to specification from the engineering organization. Materials and equipment with be in line with the production ability specified in the SOW and detailed design and style phase. The project supervision...

References: Project Management Commence. (2008). Strategies for the Task Management Body system of Knowledge (PMBOK Guide)--Fourth Model. Newton Sq, PA: Author.

Wideman, Meters. (n. g. ) Project management case study: The Personalized Woodworking Company— Woody 2000 job [Online]. Accessed September 25, 2009, from http://www.maxwideman.com/papers/woody2000/intro.htm

Wysocki, R. E. (2009). Powerful project supervision: Traditional, agile, extreme (5th ed. ). Indianapolis, IN: Wiley Creating